Examples of HW operation operation C-DM-0002S-SL The C-DM-0002S-SL module is intended for the control of addressable LEDs, which can be used either directly in the form of a classic strip or various assemblies... Examples of HW operation operation of the C-EV-0302M module The EVSE_AC_lib library contains a function block for charging electric vehicles using the CIB module C-EV-0302M. EVSE_AC_lib is supported by all Foxtrot... Examples of HW operation operation C-RC-0005R C-RC-0005R is a hotel wall controller with capacitive buttons designed to set the temperature and ventilation in the room, wake-up request, cleaning and... Examples of HW operation operation C-RC-0006R C-RC-0006R is a room wall controller with capacitive buttons designed to control lights, scenes, blinds, heating and audio. It allows measurement of temperature,... CIB modules C-KY-0001R C-KY-0001R is a glass wall controller with capacitive buttons designed for PTZS system. It contains an RFID reader, temperature sensor, two universal inputs... Foxtrot basic modules MR-0105, MR-0106, MR-0115, fitted with the CP-10x6, CP-10x8 Tab. 1 Terminating of the CH2,CH4 and DO0-1 communication channels for CP-10x6, CP-10x8 Terminal block D... Foxtrot basic modules MR-0105, MR-0106, MR-0115, fitted with CP-1000, CP-1001, CP-1003, CP-1091 Tab. 1: Terminating of CH2, CH3 and CH4 communication channels for CP-10x0 Terminal block D Terminal... Foxtrot basic modules MR-0105, MR-0106, MR-0115, fitted with the CP-10x4, CP-10x5 Tab. 1: Terminating of the CH2, CH3 and CH4 communication channels for the CP-10x4, CP-10x5 Terminal block C ... Foxtrot basic modules Communication interface CH2 ÷ CH4, using multiple submodules If more communication channels with interfaces are needed (up to 4 RS-232, RS-485 communication channels), the submodules fitted with three communication... DHW Heating, PV, EV charging Sample estimate of the minimum consumption of a house in the event of a power failure For the design of battery storage with the requirement to back up at least the minimum required part of the house installation for the required time, the... … 5 6 7 8 9 10 11 12 13 …